About us

We are an installation office that values optimal and energy-saving solutions based on modern technologies. We design, consult, evaluate and analyse solutions used in existing buildings, we propose and design solutions that give the investor energy independence at every stage of the investment's life. We start with an idea, through initial concepts, analysis and selection of optimal installation solutions in close cooperation with the Investor or Contractor.

19+
years of the group on the market
466+
projects completed by the group
30
installers

BIM

Our documentation is based on BIM (Building Information Modeling) technology, which is the basis for construction and assembly works. Installation elements are modeled in 3D space, which ensures full multi-discipline coordination and facilitates and accelerates their installation. After the investment is completed, the resulting BIM model is an invaluable knowledge base for the investor. Our models are built with simple billing and work scheduling in mind at the stage of building the facility. Thanks to this technology, it was possible to implement the "zero collision" program in our office.

Expert opinions

We prepare studies that include details about the technical condition of the installations of a given building. For complex and extensive installations, we enrich the documentation with 3D scans. If any irregularities are detected, we indicate their causes, effects and indicate the most effective ways to remove them.

Energy independence

We prepare energy audits and, based on them, design installations enabling broadly understood energy management. We propose solutions that will allow you to consciously and rationally balance and use energy through the use of renewable sources.

Design and build

The "Design and Build" mode was created especially for those investors who are looking for comprehensive service. When building facilities in this formula, we coordinate the investment process at every stage - from developing the concept to putting the facility into use. We provide 3D scanning of disappearing works as well as updating and parameterization of the BIM model

Join us

Our design team consists of people with extensive experience, high ambitions, full of enthusiasm and a positive attitude to the world. This gives us the opportunity to undertake ambitious and difficult projects throughout the country and Europe. If you want to join our team, send your CV and cover letter to rekrutacja@ibg.gda.pl.

Vistal

Design of a heavy steel construction factory hall equipped with 5 overhead cranes with a lifting capacity of 100 Mg, 5 overhead cranes with a lifting capacity of 25 Mg, 1 overhead crane with a lifting capacity of 20 Mg and an anti-corrosion hall equipped with one overhead crane with a lifting capacity of 25 Mg along with an office and social section.

 

  • Location: Gdynia
  • Built-up area: 18,459 m2

Creaton

A replacement building design and an executive design of the production hall with the social and office part, the order-picking hall, the porter's lodge, the fire protection retention tank and the transformer station building were developed.

 

  • Location: Wiszewo
  • Usable area: 32,732 m2
  • Investment value: PLN 54,000,000 gross

ABB

The industrial and warehouse facility with social and office area along with the accompanying infrastructure was designed for Zakład Produktów Energoelektroniki ABB. The whole complex consists of two single-storey technological halls and a two-storey office building.

 

  • Location: Aleksandrow Lodzki
  • Usable area: 19,645 m2
  • Investment value: PLN 98,828,594 gross

H+H silicate production hall

Execution of the detailed design, land development in terms of architecture and network for TMP, author's supervision in the above-mentioned scope and implementation of a multi-discipline construction design for the building materials factory in Reda - silicate production hall

 

  • Net area: ~4,348 m2

 



Valmont production facility

Preparation of multi-discipline design documentation in the field of conceptual design, construction design together with obtaining a building permit decision, detailed design, cost estimate documentation, preparation of a construction design for a plant superstructure, acceptance designs, participation in obtaining the required arrangements, permits and opinions.

The project included the expansion of the production hall with a loading section and maintenance workshops, extension of the office building, construction of a porter's lodge, storage and housing for technical gases in cylinders, technical gas tanks and foundations for devices, as well as land development and the necessary technical infrastructure

 

  • Total area of the study: 12,000.00 m2
Write to us

Contact data

Bałtyckie Centrum Biznesu BCB

ul. Azymutalna 9

80-298 Gdańsk

phone. +48 58 342 48 25

phone. +48 58 554 81 96

fax +48 58 551 18 57

Do you have any questions?

Write to us

biuro@imep.pl

Industria MEP Sp. z o. o., ul. Azymutalna 9, 80-298 Gdańsk, KRS 0000306540, District Court Gdańsk Północ in Gdańsk, 7th Commercial Division of the National Court Register, REGON 220650555, TIN 957-100-29-71